strandbad HARD
Realization competition for the redesign of the lido in Hard on Lake Constance
In collaboration with 4d landscape architects
The project opens up the lido area to integrate it into the existing lakeside park landscape. The bulky buildings of the "Thalerareal" at the harbor basin and the old lido building will be demolished and replaced by three new buildings interspersed in the lakeside landscape. The existing parking lot, which currently occupies the harbor basin, will be relocated to allow for the creation of a new harbor plaza.
Hard, austria
location
40.000 m²
open area
Harder Sport- und Freizeitanlagen Betriebsgesellschaft mbH
client
Fthenakis Ropee Architektenkooperative GbR
Architect
Ferdinand Albrecht, Rolf Berninger, Dorian Cani, Alexander Fthenakis
Team
Alexander Fthenakis
Project management
4d Landschaftsarchitekten
free space
Fthenakis Ropee Architektenkooperative GbR
images